Say you charge different commissions between broadcast and digital, or a specific line item shouldn't be charged a commission. Although you can set a default commission for the campaign as a whole, you also have the option to control commissions and line item fees within the individual placements.
Changing agency compensation at the line item level:
- On the Media Plan scroll to the right to view the cost section of the media plan
- Click through on the cost (for that placement) that you need to adjust (ie. Agency Compensation, Additional Cost, or Ad Serving, etc.)
- You will be brought to the cost section that you selected on the media plan
- In the Agency Compensation section, check the box to the left of the option to “Edit the compensation for this line item”
- Select the Media Commission Method from the dropdown menu
- Enter the Media Commission Rate percentage
- You may also add/remove the Fee per Line if needed
Comments